top of page

OUR PROJECTS

Oil & Gas and Mining

Evaporation pond construction.jpg
IMG_20190211_123835.jpg
Jerritt Canyon.png

{CONTRACTED - 1 ACRE/ 3000BBL DAY}

3000bbl/day (85 gpm) commercial project

SolarMultiple is currently in the design phase for integrating the enhanced evaporation system onto a pre-existing 5 acre pond facility.  COD anticipated Q4 2019

700BBL/DAY (20GPM) COMMERCIAL PILOT

Oklahoma (Client Confidential)

This Commercial Pilot System was designed by SolarMultiple in Spring of 2018.  Equipment was tested in September and October before being shipped December.  COD February 1, 2019.

JERRITT CANYON, NV

Tailing Ponds Testing

Jerritt Canyon was one of SolarMultiple's early test facilities and provided a test bed for tailings pond water disposal.  The transpired solar collector (seen at the front of the image) heated ambient air before injecting it into several above ground tanks.  Commissioned in August of 2015.

Projects: Projects

SOLARMULTIPLE

Enhanced Evaporation System Using Field Gas

PANO_20190213_143612.vr.jpg
Projects: Welcome
bottom of page