OUR PROJECTS
Oil & Gas and Mining
{CONTRACTED - 1 ACRE/ 3000BBL DAY}
3000bbl/day (85 gpm) commercial project
SolarMultiple is currently in the design phase for integrating the enhanced evaporation system onto a pre-existing 5 acre pond facility. COD anticipated Q4 2019
700BBL/DAY (20GPM) COMMERCIAL PILOT
Oklahoma (Client Confidential)
This Commercial Pilot System was designed by SolarMultiple in Spring of 2018. Equipment was tested in September and October before being shipped December. COD February 1, 2019.
JERRITT CANYON, NV
Tailing Ponds Testing
Jerritt Canyon was one of SolarMultiple's early test facilities and provided a test bed for tailings pond water disposal. The transpired solar collector (seen at the front of the image) heated ambient air before injecting it into several above ground tanks. Commissioned in August of 2015.
SOLARMULTIPLE
Enhanced Evaporation System Using Field Gas